Junzheng valve held an emergency drill on the risk of oil leakage
in order to improve the emergency rescue and disposal ability in case of sudden abnormal conditions, Junzheng valve conducted an emergency drill on the risk of oil leakage as scheduled on the morning of July 27, and achieved satisfactory results
Junzheng valve will surpass other types of plastic machine product doors. In order to improve the emergency rescue and disposal capacity in case of sudden abnormal conditions, the company conducted an emergency drill on the energy risk of oil leakage in order to absorb collision as scheduled in the morning of July 27, and the Ministry of Commerce of the people's Republic of China and the Ministry of science and technology of the people's Republic of China achieved satisfactory results
main procedures of drill:
1 The machine maintenance personnel repaired the machine tool, replaced the lubricating oil, and put the waste oil in the iron bucket. On the way to the dangerous goods warehouse, the oil bucket accidentally overturned and fell to the ground due to the too fast pulling speed on the bumpy road, resulting in the leakage of waste oil
2. Immediately stand the oil barrel upright and report to the supervisor for support
3. The emergency rescue personnel immediately brought the emergency supplies, treated the leaked waste oil, set up a barrier with sawdust to prevent the expansion of the contaminated surface or entering the sewer, and sprinkled sawdust evenly in the cofferdam for adsorption
4. Collect the sawdust, wipe off the oil on the ground with a cloth, and put the contaminated items into plastic bags
5. Clean the ground with cleaning supplies, confirm that the machinery has not been significantly improved, and no pollutants remain, and declare the end of the exercise
LINK
Copyright © 2011 JIN SHI